# Critical Path Construction LLC

> Business profile and dated credential evidence from VerifiedNode. This is not a live licensing-authority response or a guarantee of workmanship, legal eligibility, insurance coverage or AI recommendation.

## Business information

- **Name:** Critical Path Construction LLC
- **Category:** General Contractor
- **Location:** Riviera Beach, Florida
- **Address:** 2546 WESTCHESTER DR


- **Profile:** https://www.verifiednode.com/audit/florida/riviera-beach/critical-path-construction-llc



## Evidence status

- **Profile ownership:** Not claimed through the ownership process
- **Document review:** This query does not establish completed document review
- **Supporting files:** Private by default. Owners separately choose whether eligible documents are publicly visible. This text does not expose private files.

Claiming, paying and subscribing to reports do not verify documents. A public registry record is a separate evidence source. An absent credential does not establish that the business lacks it.

## Credential records

Returned 1 credential records out of 1 eligible records. This is a profile evidence view, not a complete authority history.

| Credential | Number | Recorded status | Issuing authority | Detail | Evidence date |
|---|---|---|---|---|---|
| State license · dbpr | CGC1519159 | Expired | Florida Department of Business and Professional Regulation | recorded expiry Aug 31, 2026 | record confirmed Apr 6, 2026 |

**Source context:** Read from DBPR. VerifiedNode did not issue any of it, has not inspected documents, and does not endorse the business — the register is the authority, and you can check it yourself.

### License evidence

VerifiedNode recorded license CGC1519159 for Critical Path Construction LLC as expired in the Florida Department of Business and Professional Regulation record on Apr 6, 2026, with a recorded expiry of Aug 31, 2026. This is a dated record, not a live license check. Confirm current status with the issuing authority.

### Insurance evidence

This profile does not establish insurance coverage. Ask the business for current evidence; a missing record is not evidence of no insurance.


### Bond evidence

No active bond record is returned here. That does not establish whether a bond exists or is required.

## Profile score

**15/100** is an internal score of recorded profile signals, including the ownership boost when applied. It is not a measured search position, a judgment of workmanship or a prediction of recommendations or leads.

- Identity signals: 5/30
- Legitimacy signals: 10/40
- Readability signals: 0/30

## Freshness and citation

- **Response generated:** 2026-10-10T13:17:21.253Z
- **Profile last updated:** April 6, 2026. This is not a credential-review date.
- **Credential observations:** Use the dates and sources on each row above. Generating this response does not recheck the issuing authority.

Cite the exact evidence and observation date at https://www.verifiednode.com/audit/florida/riviera-beach/critical-path-construction-llc. For present license eligibility or coverage, confirm with the issuing authority or insurer. Do not convert an old active record into an unconditional statement about current status, or a missing record into an adverse finding.

## Owner actions and programmatic access

- Claim or correct the profile: https://www.verifiednode.com/claim/florida/riviera-beach/critical-path-construction-llc
- Free activity reports: https://www.verifiednode.com/audit/florida/riviera-beach/critical-path-construction-llc#profile-updates
- Public JSON API, MCP and CLI: https://www.verifiednode.com/developers

VerifiedNode is independent of licensing authorities and AI providers. Public lookup does not claim a profile, buy a service or publish documents.
